55 MW Industrial & Marine Engine Test Facility – MTU, Ludwigsfelde, Germany
Project
Designed for a production environment, the facility was converted from an existing turbojet test cell to a post overhaul test facility for industrial and marine gas turbine testing. The facility provides for the complete engine test package to be transported on rails into the test cell with a fully integrated drive system.
Features
- Test environment replication of in-service package requirements
- Natural gas fuelled with DLE test capability
- Smooth and stepless power generation at 50 or 60 Hz with dissipation through resistive load banks
- Rail transportation system for quick engine package installation and removal
Capabilities
- Capacity 55 MW
- GE LM6000 PA, LM6000 PC, LM6000 PB, LM6000 PD
- GE LM2500, LM2500+, LM2500 DLE, LM2500+ DLE
MDS Project Scope
- Project management
- Definition of building requirements
- Aerodynamics and acoustics
- Exhaust system
- Engine adapter
- Engine handling systems
- Load absorption, including resistive load bank elements
- Gas fuel system, including gas booster station
- Hydraulic start and support systems
- Engine lubrication system
- PLC-based facility control system
- Data acquisition system














