55 MW Marine & Industrial Test Facility – MTU, Ludwigsfelde, Germany

Project

Designed for a production environment, the facility was converted from an existing turbojet test cell to a post overhaul test facility for industrial and marine gas turbine testing. The facility provides for the complete engine test package to be transported on rails into the test cell with a fully integrated drive system.

Features

  • Test environment replication of in-service package requirements
  • Natural gas fuelled with DLE test capability
  • Smooth and stepless power generation at 50 or 60 Hz with dissipation through resistive load banks
  • Rail transportation system for quick engine package installation and removal

Capabilities

  • Capacity 55 MW
  • GE LM6000 PA, LM6000 PC, LM6000 PB, LM6000 PD
  • GE LM2500, LM2500+, LM2500 DLE, LM2500+ DLE

MDS Project Scope

  • Project management
  • Definition of building requirements
  • Aerodynamics and acoustics
  • Exhaust system
  • Engine adapter
  • Engine handling systems
  • Load absorption, including resistive load bank elements
  • Gas fuel system, including gas booster station
  • Hydraulic start and support systems
  • Engine lubrication system
  • PLC-based facility control system
  • Data acquisition system